A
final push?
After
Chris retired in March 2011, we decided to put our efforts into
getting the house done so we could actually enjoy it. A three-month
trip early in 2012 resulted in getting the insulation and sheetrock
done, so now the house really looks like a house. This was the
beginning of what we expect to be a "final push" early
next year. We also brought the dogs on
this trip—their first time here. We actually drove across
country with them, an experience in itself!
|
|
The
interior Feb. 2012 |
|
Sheetrocking
the living room ceiling. |
Main living area (on second floor) looking out toward the ocean. That's John painting the deck.
|
|
|
|
Applying
foam insulation in the roof. |
Sheetrocking the ceiling. Tory, Miguel, and Noel.
The
state of the house as we left in April, 2012
|
|
|
|
|
|
Insulation
complete. |
Our crack sheetrock team: Big Al, Miguel, and Noel.
Where
the kitchen will be (second floor, looking toward garden).
|
Looking
toward the main entrance. Kitchen and living area
are on right; stairwell to downstairs is on left.
|
|
Looking
downstairs to first floor.
|
|
|
|
|
Passage
between living room area and master bedrooom. |
First
floor main area (where we've been "living." |
John
and Felix. Bob's right and left hands and good friends. |
|
|
|
Master
bedroom. That's Felix finishing up.
Our
temporary kitchen (downstairs) which will be the laundry
room. |
|
|